What is Partial Discharge_Basics

Partial Discharges Х Once the electric stress in the void exceeds 3 kV/mm (at kPa), electric breakdown (a ^discharge or flow of electrons) will occur in the gas Х When the electrons hit the edge of the void, any organic material (polyethylene, epoxy, oil) will be gradually decomposed Ц aging Х A discharge in air also creates ozoneFile Size: 1MB. Standard Definitions Х Fundamentally, what is a УPartial DischargeФ Х An electric discharge which only partially bridges the insulation, and which may or may not occur adjacent to a conductor - Authoritative Dictionary of IEEE Standard Terms Х A discharge that does not completely bridge the insulation between electrodes - IEEE Standard 4, IEEE Standard for High-Voltage Testing Techniques.

PD is an important failure mode- 1. These four are the main stresses that lead to general ageing and also local damage. Partial discharge within an insulation defect. This block of Perspex had electrodes on two faces- with a needle as one: the second a ground what is partial discharge pdf. There is a high Electro mechanical stress in the Perspex around the needle tip.

It eventually leads to a void ground at the needle tip, PD and then local breakdown in the Perspex. The tree then starts. Tree Growth Ч a model study in Perspex. The structure of the perspex will break down to form free carbon. So the branches will become carbonised, and eventually more will form and extend through the perspex as a tree. The material ahead is still insulating and high impedance. This prevents any significant current flow in the carbon track and a power follow-through is prevented.

So the breakdowns stay local. Partial Discharge 1. This is detected as a current by Z. Groups of discharges originate from a single void and give rise how to treat melasma naturally current pulses pos.

Conventional PD Measurement. Nakao et al. Sparling et al. Many materials will withstand low level partial discharge- often for many years. Traditional materials are the best to withstand PD. But a poor material can be improved by using barriers. That is why laminates are so important. E D Diagram Key: C B 1 Ч XLPE insulation 2 Ч Copper conductor 3 Ч Stress cone silicone rubber conductive insert, electrically floating 4 Ч Electric field equipotential lines diagrammatic 5 Ч Region of high electrical stress and surface damage.

Discharge damage to the XLPE insulation under the graphite coating. It was taking over a year to get to this stage. Water treeing failures have been common throughout the what is sea kelp used for. This is revealed by staining.

Through most of the development stage water trees are not carbonised. Picture- 11 kV cable after 6 years in service What is a high mileage oil change End exposed too long after pull in. But there is no consensus on best method to detect water trees- but probably a dielectric loss measurement. Better to avoid Water treeing with an effective sheath barrier, and not leaving ends exposed after pulling in.

Not the same transformer! But note the inter-phase barrier boards and winding wraps. Tracking on wrap- on sister unit.

Here a metal cup is used to spread the load from clamping beam supports. But the clamping beam can move over time and lose electrical contact to the cup, leading to PD. It is unlikely to cause failure other than by excess combustible gas production.

But since clamping is loose the risk is higher for failure under short circuit. Mechanical deformation will only cause damage if either at the initiating fault- or later- the winding paper is damaged.

This can then lead to long term PD. Here there is a clear thermal fault due to loss of insulation between the tank and frame. PD is a common failure mode with bushings, and failure often will lead to loss of the transformer. This particular design was used in 19 generator transformers.

On these oil tests showed evidence of PD. This was moisture induced. But there have been discharges in badly made cap and pin insulators, above the pin head.

IEC 0. This implies poor design against fast transients. These epoxy cast insulators are part of the operating mechanism. With a manufacturing void PD will reduce a casting to the shrapnel below- and expelled with force as they escape the pressurised SF6 chamber through the bursting disc. In bushings and switchgear supports made what are old wives fables synthetic resin bonded paper PD is usually associated with water ingress.

They are Different! So a factory test is less useful than for other equipment. Most machines exhibit PD at working voltage- less so in pressurised hydrogen. Type 2 Vibration induced damage due to loose bars. Type 3 Vibration induced loss of contact between bar and core. Bar capacitance discharges on vibration contact. High temperatures to melt resin and glass. Close-up of damage. But with bar bounce the coating will be damaged at the points of contact. Stator core The bar will discharge to the core due to the potential induced on the The bar is loose and makes contact only at two places now floating coating.

Detached field grading slot-exit discharges Conducting Contamination vibration and girth cracks on spacer between phases. Doble 20kV 1. PD Test on High Voltage Source. This impedance transforms the partial-discharge proportional current pulses to voltage suitable for the PD detector input for further integration and signal processing. The PD mechanism- Definitions. Discharge Inception voltage Lowest Voltage at the terminals which create discharges in a sample.

We can measure this. Discharge Extinction voltage- Voltage at the terminals below which discharges once started will not occur. This is generally lower than inception- hysterisis pending on defect and available charge carriers.

Apparent discharge magnitude The equivalent charge level relating to the voltage drop at the terminals. Real discharge magnitude Actual charge transferred at the void during each discharge. Always more than the Apparent charge. IEC Losses Losses. Phase Resolved Partial Discharge Pattern. Just like a fingerprint every defect has distinct characteristics. Many small voids Ч C o n d u c to r individual large normal pattern gas inclusions V o id S lo t. Pattern and distribution of pulses determines the location of the voids e.

Ground Insulation. PD-Smart Acquision units. High Synchroneous ns. Windowing - Software or Sine-shaped Pulse-shaped hardware windowing of pulse shaped noise repeating at the same period on the phase. Filtering - Periodic frequency Compensation Ч using parasitic selective sensor and subtraction of pulse filtering of Stochastic shaped stochastical common sinusoidal noise mode noise.

Windowing Software or hardware. Pulse shaping periodical noise power electronic inverters. If the interference is continuous white noise then try to measure at a different centre frequency and reduce the Band Width.

This is a very effective tool of dealing with sinusoidal interference such as radio stations. Avoid for the off-line test the higher frequencies as the higher the detection frequency the more short-sighted the measurement becomes. Up to 3 MHz most of the winding can still be seen. But sometimes there is no other choice. Noise suppression troug adjustable frequencies Adjust of the Measuring and bandwiths frequency.

They are easily recognised as they are not phase synchronised exceptions possible and appear as a horizontal line with elevated magnitude. When the disturbance signal arrives at the Antenna the amplifier is switched off for this short duration.

PD may be present but the high interference masks the true PD. The how to steal money online are not meaningful.

Welcome to Scribd!

Partial discharge testing is similar in concept to the RF noise detection, and recent advances in test equipment and testing standards now make it possible to use this much more sensitive method with our products. Just as Burr-BrownТs products are at the forefront of technology, our use of partial. Partial Discharge Partial discharges are small electrical sparks that occur within the electric insulation of switchgear, cables, transformers, and windings in large motors and generators. Partial Discharge Analysis is a proactive diagnostic approach that uses partial discharge (PD) measurements to evaluate the integrity of this equipment. Each. Partial Discharge can be described as an electrical pulse or discharge in a gas-filled void or on a dielectric surface of a solid or liquid insulation system. This pulse or discharge only partially bridges the gap between phase insulation to ground, or phase to phase insulation.

In electrical engineering , partial discharge PD is a localized dielectric breakdown DB which does not completely bridge the space between the two conductors of a small portion of a solid or fluid electrical insulation EI system under high voltage HV stress.

While a corona discharge CD is usually revealed by a relatively steady glow or brush discharge BD in air, partial discharges within solid insulation system are not visible. PD can occur in a gaseous, liquid or solid insulating medium. It often starts within gas voids, such as voids in solid epoxy insulation or bubbles in transformer oil. Protracted partial discharge can erode solid insulation and eventually lead to breakdown of insulation.

PD usually begins within voids, cracks, or inclusions within a solid dielectric , at conductor -dielectric interfaces within solid or liquid dielectrics, or in bubbles within liquid dielectrics. Since PDs are limited to only a portion of the insulation, the discharges only partially bridge the distance between electrodes.

PD can also occur along the boundary between different insulating materials. Partial discharges within an insulating material are usually initiated within gas-filled voids within the dielectric. Because the dielectric constant of the void is considerably less than the surrounding dielectric, the electric field across the void is significantly higher than that across an equivalent distance of dielectric.

If the voltage stress across the void is increased above the corona inception voltage CIV for the gas within the void, PD activity will start within the void. PD can also occur along the surface of solid insulating materials if the surface tangential electric field is high enough to cause a breakdown along the insulator surface. This phenomenon commonly manifests itself on overhead line insulators, particularly on contaminated insulators during days of high humidity.

Overhead lines use air as their insulation medium. The equivalent circuit of a dielectric incorporating a cavity can be modeled as a capacitive voltage divider in parallel with another capacitor. The upper capacitor of the divider represents the parallel combination of the capacitances in series with the void and the lower capacitor represents the capacitance of the void.

The parallel capacitor represents the remaining unvoided capacitance of the sample. Whenever partial discharge is initiated, high frequency transient current pulses will appear and persist for nanoseconds to a microsecond, then disappear and reappear repeatedly as the voltage sinewave goes through the zero crossing.

The PD happens near the peak voltage both positive and negative. The HFCT is a "high frequency" current transducer which is clamped around the case ground of the component being tested. The severity of the PD is measured by measuring the burst interval between the end of a burst and the beginning of the next burst. As the insulation breakdown worsens, the burst interval will shorten due to the breakdown happening at lower voltages.

This burst interval will continue to shorten until a critical 2 millisecond point is reached. At this 2 ms point the discharge is very close to the zero crossing and will fail with a full blown discharge and major failure.

The HFCT method is done while the component being tested stays energized and loaded. It is completely non-intrusive. Another method of measuring these currents is to put a small current-measuring resistor in series with the sample and then view the generated voltage on an oscilloscope via a matched coaxial cable. Detection of the high-frequency pulses will identify the existence of partial discharge, arcing or sparking.

After PD or arcing is detected, the next step is to locate the fault area. Bandpass filtering is used to eliminate interference from system noises. With the partial discharge measurement, the dielectric condition of high voltage equipment can be evaluated, and electrical treeing in the insulation can be detected and located.

Partial discharge measurement can localize the damaged part of an insulated system. Data collected during partial discharge testing is compared to measurement values of the same cable gathered during the acceptance-test or to factory quality control standards. This allows simple and quick classification of the dielectric condition new, strongly aged, faulty of the device under test and appropriate maintenance and repair measures may be planned and organized in advance.

Partial discharge measurement is applicable to cables and accessories with various insulation materials, such as polyethylene or paper-insulated lead-covered PILC cable. Partial discharge measurement is routinely carried out to assess the condition of the insulation system of rotating machines motors and generators , transformers , and gas-insulated switchgear.

A number of discharge detection schemes and partial discharge measurement methods have been invented since the importance of PD was realised early in the last century. Partial discharge currents tend to be of short duration and have rise times in the nanosecond realm. On an oscilloscope , the discharges appear as evenly spaced burst events that occur at the peak of the sinewave. Random events are arcing or sparking. The usual way of quantifying partial discharge magnitude is in pico coulombs.

The intensity of partial discharge is displayed versus time. An automatic analysis of the reflectograms collected during the partial discharge measurement Ч using a method referred to as time domain reflectometry TDR Ч allows the location of insulation irregularities.

They are displayed in a partial discharge mapping format. A phase-related depiction of the partial discharges provides additional information, useful for the evaluation of the device under test.

The actual charge change that occurs due to a PD event is not directly measurable, therefore, apparent charge is used instead.

The apparent charge q of a PD event is the charge that, if injected between the terminals of the device under test , would change the voltage across the terminals by an amount equivalent to the PD event. This can be modeled by the equation:.

Apparent charge is not equal to the actual amount of changing charge at the PD site, but can be directly measured and calibrated. This is measured by calibrating the voltage of the spikes against the voltages obtained from a calibration unit discharged into the measuring instrument. The calibration unit is quite simple in operation and merely comprises a square wave generator in series with a capacitor connected across the sample.

Usually these are triggered optically to enable calibration without entering a dangerous high voltage area. Calibrators are usually disconnected during the discharge testing. Field measurements preclude the use of a Faraday cage and the energising supply can also be a compromise from the ideal. Field measurements are therefore prone to noise and may be consequently less sensitive. Factory quality PD tests in the field require equipment that may not be readily available, therefore other methods have been developed for field measurement which, while not as sensitive or accurate as standardized measurements, are substantially more convenient.

By necessity field measurements have to be quick, safe and simple if they are to be widely applied by owners and operators of MV and HV assets. Transient Earth Voltages TEVs are induced voltage spikes on the surface of the surrounding metalwork. TEVs occur because the partial discharge creates current spikes in the conductor and hence also in the earthed metal surrounding the conductor.

Dr John Reeves established that TEV signals are directly proportional to the condition of the insulation for all switchgear of the same type measured at the same point. TEV readings are measured in dBmV.

TEV pulses are full of high frequency components and hence the earthed metalwork presents a considerable impedance to ground. Therefore, voltage spikes are generated. These will stay on the inner surface of surrounding metalwork to a depth of approximately 0.

There is a secondary effect whereby electromagnetic waves generated by the partial discharge also generate TEVs on the surrounding metalwork Ч the surrounding metalwork acting like an antenna. TEVs are a very convenient phenomenon for measuring and detecting partial discharges as they can be detected without making an electrical connection or removing any panels.

While this method may be useful to detect some issues in switchgear and surface tracking on internal components, the sensitivity is not likely to be sufficient to detect issues within solid dielectric cable systems. Ultrasonic measurement relies on fact that the partial discharge will emit sound waves. The frequency for emissions is "white" noise in nature and therefore produces ultrasonic structure waves through the solid or liquid filled electrical component. Using a structure borne ultrasonic sensor on the exterior of the item under examination, internal partial discharge can be detected and located when the sensor is placed closest to the source.

The closer the bursts get to "zero voltage crossing" the more severe and critical the PD fault is. Location of the fault area is accomplished using AE described above. Electro Magnetic Field detection picks up the radio waves generated by the partial discharge.

As noted before the radio waves can generate TEVs on the surrounding metalwork. More sensitive measurement, particularly at higher voltages, can be achieved using in built UHF antennas or external antenna mounted on insulating spacers in the surrounding metalwork.

Directional Coupler detection picks up the signals emanating from a partial discharge. This method is ideal for joints and accessories, with the sensors being located on the semicon layers at the joint or accessory. Once begun, PD causes progressive deterioration of insulating materials, ultimately leading to electrical breakdown. The effects of PD within high voltage cables and equipment can be very serious, ultimately leading to complete failure.

The cumulative effect of partial discharges within solid dielectrics is the formation of numerous, branching partially conducting discharge channels, a process called treeing. Repetitive discharge events cause irreversible mechanical and chemical deterioration of the insulating material.

Damage is caused by the energy dissipated by high energy electrons or ions , ultraviolet light from the discharges, ozone attacking the void walls, and cracking as the chemical breakdown processes liberate gases at high pressure. The chemical transformation of the dielectric also tends to increase the electrical conductivity of the dielectric material surrounding the voids.

This increases the electrical stress in the thus far unaffected gap region, accelerating the breakdown process. A number of inorganic dielectrics, including glass , porcelain , and mica , are significantly more resistant to PD damage than organic and polymer dielectrics. In paper-insulated high-voltage cables, partial discharges begin as small pinholes penetrating the paper windings that are adjacent to the electrical conductor or outer sheath.

As PD activity progresses, the repetitive discharges eventually cause permanent chemical changes within the affected paper layers and impregnating dielectric fluid. Over time, partially conducting carbonized trees are formed. This places greater stress on the remaining insulation, leading to further growth of the damaged region, resistive heating along the tree, and further charring sometimes called tracking. This eventually culminates in the complete dielectric failure of the cable and, typically, an electrical explosion.

Partial discharges dissipate energy in the form of heat, sound, and light. Localized heating from PD may cause thermal degradation of the insulation. Although the level of PD heating is generally low for DC and power line frequencies, it can accelerate failures within high voltage high-frequency equipment.

The integrity of insulation in high voltage equipment can be confirmed by monitoring the PD activities that occur through the equipment's life.

To ensure supply reliability and long-term operational sustainability, PD in high-voltage electrical equipment should be monitored closely with early warning signals for inspection and maintenance. PD can usually be prevented through careful design and material selection. In critical high voltage equipment, the integrity of the insulation is confirmed using PD detection equipment during the manufacturing stage as well as periodically through the equipment's useful life.

PD prevention and detection are essential to ensure reliable, long-term operation of high voltage equipment used by electric power utilities. Utilizing UHF couplers and sensors, partial discharge signals are detected and carried to a master control unit where a filtering process is applied to reject interference.